Bard 150102

Instrukcja obsługi prostokątnej torby na nogę Bard Dispoz-a-Bag

Wstęp

This manual provides essential information for the safe and effective use of the Bard Dispoz-a-Bag Rectangular Leg Bag. Please read all instructions carefully before using the product. The Bard Dispoz-a-Bag is a durable and reusable medical waste bag designed for efficient and safe collection. This rectangular bag is crafted from sturdy vinyl, ensuring it can withstand multiple uses. It is specifically designed for medical waste disposal and is an essential addition to medical supplies. Easy to clean and maintain, this bag promotes a clean and safe environment.

Bard Dispoz-a-Bag Rectangular Leg Bag with straps and drainage tube

An image showing the Bard Dispoz-a-Bag Rectangular Leg Bag. The bag is translucent, rectangular, and features two sets of white straps for securing it to the leg. A green drainage tube with a clamp is visible at the bottom, and a connection port is at the top.

Główne cechy

Instrukcje konfiguracji

1. Rozpakowywanie

  1. Carefully remove the Bard Dispoz-a-Bag from its packaging.
  2. Inspect the bag and all components (straps, tubing, clamp) for any signs of damage or defects. Do not use if damaged.

2. Attaching the Leg Bag

  1. Position the leg bag on your thigh or calf, ensuring the drainage port is at the bottom.
  2. Wrap the elastic leg straps around your leg, threading them through the designated loops on the bag.
  3. Adjust the straps to a comfortable fit. The bag should be secure enough to prevent slipping but not so tight as to restrict circulation.
  4. Ensure the bag lies flat against your leg to minimize bulk and maximize comfort.

3. Connecting to a Catheter

  1. Ensure the catheter tubing is clean and free of obstructions.
  2. Connect the catheter tubing securely to the inlet port at the top of the leg bag. Ensure a tight seal to prevent leaks.
  3. Verify that the drainage clamp on the leg bag is closed before connection to prevent immediate drainage.

Instrukcja obsługi

1. Monitoring and Draining

  1. Regularly monitor the fill level of the leg bag. Do not allow the bag to become overly full, as this can cause discomfort or leakage.
  2. To drain the bag, position the drainage port over a toilet or suitable receptacle.
  3. Open the drainage clamp or valve to allow the contents to flow out.
  4. Once empty, close the drainage clamp or valve securely.

2. Securing the Drain Valve

After draining, always ensure the drain valve or clamp is fully closed and secured to prevent accidental leakage. A click or firm resistance usually indicates a secure closure.

Konserwacja i pielęgnacja

1. Cleaning the Leg Bag

  1. Disconnect the leg bag from the catheter.
  2. Rinse the inside of the bag thoroughly with cool water.
  3. Clean the bag using a mild soap and water solution. Gently scrub all surfaces, paying attention to the drainage port and inlet.
  4. Rinse again with clean water until all soap residue is removed.

2. Dezynfekcja

  1. Prepare a disinfecting solution according to manufacturer guidelines (e.g., a solution of 1 part white vinegar to 3 parts water, or a commercial disinfectant).
  2. Pour the solution into the bag and swirl to ensure all internal surfaces are coated.
  3. Allow the solution to remain in the bag for the recommended contact time (e.g., 20-30 minutes for vinegar solution).
  4. Drain the disinfecting solution and rinse the bag thoroughly with sterile water to remove all traces of the disinfectant.

3. Przechowywanie

After cleaning and disinfection, allow the leg bag to air dry completely before storing. Store in a clean, dry place away from direct sunlight and extreme temperatures.

4. Wymiana

The Bard Dispoz-a-Bag is reusable, but its lifespan depends on usage and maintenance. Inspect the bag regularly for signs of wear, cracks, or discoloration. Replace the bag immediately if any damage is observed or if it becomes difficult to clean effectively.

Rozwiązywanie problemów

Typowe problemy i rozwiązania

Specyfikacje

FunkcjaSzczegół
MarkaBard
Numer modelu150102
Liczba jednostek1.00 Liczba
Zalecane zastosowaniaOdpady medyczne
Cecha materiałuWielokrotnego użytku
KolorBiały
TworzywoWinyl
Formularz przedmiotuTorba
Liczba elementów1
Rozmiar1 sztuka (opakowanie 1)
ASINB00427LDMG
Data pierwszej dostępności26 czerwca 2019 r.

Gwarancja i wsparcie

For specific warranty information or technical support regarding your Bard Dispoz-a-Bag Rectangular Leg Bag, please refer to the documentation provided with your purchase or contact Bard customer service directly. Contact details can typically be found on the product packaging or the official Bard webstrona.

Powiązane dokumenty - 150102

Przedview Instrukcja obsługi części zamiennych do klimatyzatorów ściennych Bard – modele W18LB-A, W24LB-A, W24LB-B, W24LB-F
Kompleksowa instrukcja części zamiennych do klimatyzatorów ściennych Bard, modele W18LB-A, W24LB-A, W24LB-B i W24LB-F. Zawiera części rozłożone. views, parts lists, and component descriptions for cabinet, functional, control panel, and blower assembly components.
Przedview Instrukcja obsługi części zamiennych do klimatyzatora ściennego Bard W12AF-A W12AF-K
Kompleksowy podręcznik części zamiennych do modeli W12AF-A i W12AF-K klimatyzatorów ściennych Bard, szczegółowo opisujący elementy obudowy, elementy funkcjonalne, panel sterowania i zespół wentylatora, a także numery części i schematy.
Przedview Instrukcja montażu pompy ciepła Bard C24H2/C30H2 do montażu na ścianie w opakowaniu
Oficjalna instrukcja instalacji ściennych pomp ciepła Bard serii C24H2 i C30H2. Zawiera szczegółowe instrukcje dotyczące montażu, okablowania, uruchomienia i rozwiązywania problemów, zapewniając profesjonalną instalację i optymalną wydajność systemu.
Przedview Instrukcja obsługi części zamiennych do klimatyzatorów ściennych Bard W12AB-A, W12AB-D, W12AB-K
Official replacement parts manual for Bard Wall Mounted Packaged Air Conditioner models W12AB-A, W12AB-D, and W12AB-K. Includes detailed diagrams and part lists for cabinet components, functional components, control panel parts, and blower assembly parts.
Przedview Bard Low VoltagInstrukcja instalacji okablowania obwodu sterującego
Instrukcja montażu klimatyzatorów Bard, obejmująca klimatyzatory niskoobjętościowetagSchemat okablowania obwodu sterującego dla różnych modeli, w tym W**A, W**L, W**A*D, W**L*D i WA*S2. Szczegółowe schematy okablowania, kompatybilność termostatów i opcje konfiguracji.
Przedview Instrukcja montażu klimatyzatora ściennego Bard 11EER serii WA
Kompleksowy przewodnik instalacji klimatyzatorów ściennych Bard serii 11EER WA (modele W12AB-A, W12AB-D, W12AB-K), obejmujący informacje ogólne, kroki instalacji, okablowanie, procedury uruchamiania i wskazówki serwisowe. Zawiera nazewnictwo modeli, zasady bezpieczeństwa i specyfikacje techniczne.