BERNSTEIN R18W

Instrukcja obsługi grzejnika łazienkowego BERNSTEIN R18W ze stali białej

Model: R18W (1200x500mm)

1. Wprowadzenie

This manual provides essential information for the safe and efficient installation, operation, and maintenance of your BERNSTEIN R18W White Steel Bathroom Towel Radiator. Please read these instructions carefully before installation and retain them for future reference. This radiator is designed for use with standard central heating systems and can also be adapted for electric operation (electric heating element not included).

2. Instrukcje bezpieczeństwa

  • Installation must be performed by a qualified professional in accordance with local building and wiring regulations.
  • Ensure the radiator is securely mounted to a suitable wall structure capable of supporting its weight when filled with water.
  • Do not cover the radiator with flammable materials.
  • Keep children and pets away from the radiator when it is hot to prevent burns.
  • Before any maintenance or cleaning, ensure the radiator is cool and, if connected to an electrical supply, disconnected from power.
  • Do not use abrasive cleaners or solvents on the radiator's surface.
  • The radiator is designed for heating towels and warming the bathroom space. Do not use it for purposes other than its intended function.

3. Zawartość opakowania

Przed przystąpieniem do montażu należy sprawdzić, czy wszystkie elementy są obecne i nieuszkodzone.

  • BERNSTEIN R18W Towel Radiator (1200x500mm)
  • Wall mounting brackets and fixings
  • Straight towel rail accessory
  • Korek odpowietrznika
  • Korek zaślepiający

Notatka: A connection kit (valves, electric heating element) is nie wliczone and must be purchased separately if required.

4. Koniec produktuview

The BERNSTEIN R18W is a modern white steel towel radiator designed for bathrooms. It features a rectangular shape with horizontal tubes and vertical D-profiles, providing both efficient heating and a stylish appearance.

BERNSTEIN R18W towel radiator installed in a modern bathroom

Image 1: BERNSTEIN R18W towel radiator in a bathroom setting.

BERNSTEIN R18W towel radiator, front view with 1200x500mm dimensions

Obraz 2: Przód view of the BERNSTEIN R18W radiator, highlighting its 1200x500mm dimensions.

The radiator is finished in White RAL9016 and includes a straight towel rail for added functionality.

Close-up of the straight towel rail accessory and a towel hanging on a radiator

Image 3: The included straight towel rail accessory and an example of a towel on a radiator.

5. Instalacja

5.1 Kontrole przed instalacją

  • Verify that the wall where the radiator will be mounted is structurally sound and can support the weight of the radiator when filled with water.
  • Ensure adequate space around the radiator for proper heat distribution and access for maintenance.
  • Confirm that the plumbing connections (lateral or central, G1/2" connectors) are correctly positioned.

5.2 Montaż na ścianie

  1. Refer to the technical drawing for precise dimensions and mounting point locations.
  2. Mark the drilling points on the wall using the provided mounting brackets as a template.
  3. Wywierć otwory i włóż odpowiednie kołki rozporowe (upewnij się, że są odpowiednie do rodzaju Twojej ściany).
  4. Przymocuj uchwyty montażowe do ściany.
  5. Carefully lift the radiator and position it onto the secured brackets.
  6. Tighten any retaining screws on the brackets to firmly hold the radiator in place.
Technical drawing showing dimensions and connection points for the BERNSTEIN R18W radiator

Image 4: Technical drawing with detailed dimensions and connection options.

5.3 Połączenia hydrauliczne

The radiator offers both lateral and central connection options with G1/2" connectors. Connect the radiator to your central heating system using appropriate valves (not included). Ensure all connections are sealed properly to prevent leaks.

Close-up of the top connection point of the radiator

Obraz 5: Zbliżenie view of the top connection point.

Close-up of the bottom connection points of the radiator

Obraz 6: Zbliżenie view of the bottom connection points.

5.4 Filling and Bleeding

  1. Once plumbing connections are secure, slowly fill the central heating system.
  2. Open the air vent plug at the top of the radiator using a radiator key to release trapped air.
  3. Close the air vent plug once water starts to emerge steadily.
  4. Sprawdź szczelność wszystkich połączeń.

6. Działanie

6.1 Central Heating Operation

The BERNSTEIN R18W radiator operates as part of your existing central heating system. Adjust the heat output using the radiator valves (not included) or your central heating thermostat.

6.2 Electric Operation (Optional)

This radiator can be converted for electric-only operation by installing a suitable electric heating element (not included) and filling it with a heat transfer fluid. This modification must be carried out by a qualified electrician and plumber, adhering to all electrical safety standards.

7. Konserwacja

7.1 Czyszczenie

Clean the radiator regularly with a soft, damp cloth. For stubborn marks, a mild soap solution can be used. Rinse thoroughly and dry immediately. Avoid abrasive cleaners, scouring pads, or chemical solvents as these can damage the finish.

7.2 Bleeding the Radiator

If the top of the radiator feels cold while the bottom is hot, it indicates trapped air. Bleed the radiator as described in Section 5.4 to ensure efficient operation.

7.3 Kontrole roczne

Periodically check all connections for any signs of leaks or corrosion. Ensure mounting brackets remain secure.

8. Rozwiązywanie Problemów

ProblemMożliwa przyczynaRozwiązanie
Radiator not heating up fully (cold at top)Trapped airBleed the radiator using the air vent plug.
Radiator not heating at allValves closed, central heating system off, or system faultCheck radiator valves are open. Ensure central heating system is operational. Consult a heating engineer if system fault is suspected.
Wyciek wody z połączeńLoose connections or faulty sealsTighten connections (do not overtighten). Replace seals if necessary. Consult a plumber.

9. Specyfikacje

MarkaBURSZTYN
ModelR18W
Wymiary (wysokość x szerokość)1200mm x 500mm
TworzywoStal
SkończyćBiały RAL9016
Horizontal TubesØ 22 mm, straight
Pionowy ProfilesD-profiles: 30 x 40 mm
Opcje połączeniaLateral or central, G1/2" connectors
Metoda instalacjiMontaż ścienny
CertyfikatyCertyfikat CE
Dołączone akcesoriaStraight towel rail, wall mounting kit, air vent plug, blanking plug
Zestaw połączeniowyNie wliczone

10. Gwarancja i wsparcie

For warranty information and customer support, please refer to the documentation provided at the point of purchase or visit the official BERNSTEIN webZachowaj dowód zakupu na wypadek roszczeń gwarancyjnych.